Landscape Installations in St George, Utah

The crew, the sequence, and the site work that turn a plan into a yard. Grading, irrigation, hardscape, boulders, planting, and lighting, installed in the order that lasts.

Installation is where a landscape succeeds or fails, and most of it happens below the finished surface. The compacted base under the pavers, the caliche broken at every tree, the drainage that carries a monsoon away from the foundation, the pressure regulator on the drip mainline: none of it shows and all of it decides how the yard looks in five years.

We install from our own designs and from plans homeowners bring us. Either way, our landscaping crew follows the same sequence and the same standards on every Washington County lot, whether that is a new build in Washington Fields or a renovation in Santa Clara. This page is linked from our landscape designer page because design and installation are two halves of one job.

The installation sequence

Every full install runs in the same order, because the order is what keeps later work from destroying earlier work. Demolition and haul off first, including old sod, failed concrete, and the construction debris that hides in the fill on new lots. Then rough grading to set the drainage pattern, with swales, dry creek routes, and the fall away from the house established before anything else. Then the irrigation mainline, valves, and sleeves under every future hard surface.

Hardscape comes next: bases, pavers, walls, steps, and footings for structures. Boulders are set with equipment while there is still room to move it. Then lighting conduit, drip laterals, and finally planting and mulch. Plants go in last so they are never driven over, and in the season that gives them the best chance.

Irrigation trenches and valve box installed in caliche soil at a Hurricane Utah home
Irrigation trenches and a valve box cut into caliche and red soil at a Hurricane new build: mainline and sleeves go in before any hardscape.

Site work for Washington County soil

The ground here is the first thing we solve. Caliche hardpan sits a foot or two down almost everywhere in the county, from downtown St George to Little Valley to Hurricane. We break through it at every tree and large shrub location and, where full removal is impractical, drill drainage chimneys beside the root zone and fill them with gravel so water has somewhere to go. Blow sand in Washington Fields and around Sand Hollow gets geotextile under bases and compost in planting holes. Expansive clay pockets in parts of Washington City get deeper bases and drainage that keeps water away from slabs.

Grading follows the water. Eight inches of annual rain arriving mostly in July and August thunderstorms means every yard needs a clear path for runoff. We set finished grade to fall away from foundations, route it into planted swales or rock lined dry creeks, and use permeable surfaces where the county rebate or the lot's drainage calls for them.

Irrigation built to the rules

Every system we install is drip for beds and trees, with spray or rotary heads only on lawn. The mainline carries a filter and a pressure regulator, and a pressure regulating valve is added at the meter when static pressure exceeds 90 psi, which the city requires. Zones are separated by plant water need and sun exposure. The controller is a smart, weather adjusting model programmed for the St George summer window of 8 pm to 10 am and set for cycle and soak so water soaks into sandy or caliche soil rather than running off.

On rebate projects we install to the water district's drip and plant cover requirements and document the system the way the district's inspector expects to see it.

Completed landscape installation in Little Valley with rock mulch, agave, and a young desert willow at golden hour
A just finished Little Valley install at golden hour: raked rock, boulders, agave, red yucca, and a staked desert willow with a drip ring.

Planting in the right season

Fall through early spring is planting season on the Mojave edge. A one gallon plant set in October has six months of cool weather to root before the first 100 degree day, and it will outgrow a five gallon plant set in June within two years. We schedule planting accordingly whenever a project allows, and when a summer install cannot wait we plant early in the morning, water deeply, and set an establishment schedule that runs heavier for the first season.

Trees are staked, watered on their own drip zone, and mulched away from the trunk. Boulders are set a third buried so they look like they belong to the ground. Rock mulch is chosen for the wind exposure of the lot so it stays where it was raked.

Walkthrough and the first year

Every install ends with a walkthrough. We show you each valve and zone, explain the controller, hand over the plant schedule, and set the watering program for the season. Then we tell you what to expect: the first summer is the hard one, the second summer the yard fills in, and by the third it looks like the rendering. Installations are the build side of the landscape design work described on that page, and the way every whole yard project we take on gets built.

Related services

Installation questions from Washington County homeowners

Will you install a plan drawn by someone else?

Yes. We review the plan for problems specific to this climate and soil, flag anything that will not survive or will not pass city or HOA review, and quote the installation from the drawing.

What time of year is best to install a landscape in St George?

Hardscape can go in year round, though crews work faster outside of July and August. Planting is best from October through March so roots establish before summer. We often build hardscape in summer and plant in fall on the same project.

Do you pull permits for landscape installations?

Yes, where they apply: retaining walls 4 feet or taller, any wall in the front setback, work in the city right of way, and structures that require them. Most planting and paver work does not require a permit, but we check every project against the city code.

Are you licensed and insured?

Yes. We carry the licensing and insurance required to do landscape construction in Utah, and we can provide certificates for your HOA or lender on request.

Built right the first time, below the surface and above it

Landscape installations from our plans or yours in St George, Washington, Santa Clara, Ivins, Little Valley, and Hurricane. Quotes are free.