The installation sequence
Every full install runs in the same order, because the order is what keeps later work from destroying earlier work. Demolition and haul off first, including old sod, failed concrete, and the construction debris that hides in the fill on new lots. Then rough grading to set the drainage pattern, with swales, dry creek routes, and the fall away from the house established before anything else. Then the irrigation mainline, valves, and sleeves under every future hard surface.
Hardscape comes next: bases, pavers, walls, steps, and footings for structures. Boulders are set with equipment while there is still room to move it. Then lighting conduit, drip laterals, and finally planting and mulch. Plants go in last so they are never driven over, and in the season that gives them the best chance.

Site work for Washington County soil
The ground here is the first thing we solve. Caliche hardpan sits a foot or two down almost everywhere in the county, from downtown St George to Little Valley to Hurricane. We break through it at every tree and large shrub location and, where full removal is impractical, drill drainage chimneys beside the root zone and fill them with gravel so water has somewhere to go. Blow sand in Washington Fields and around Sand Hollow gets geotextile under bases and compost in planting holes. Expansive clay pockets in parts of Washington City get deeper bases and drainage that keeps water away from slabs.
Grading follows the water. Eight inches of annual rain arriving mostly in July and August thunderstorms means every yard needs a clear path for runoff. We set finished grade to fall away from foundations, route it into planted swales or rock lined dry creeks, and use permeable surfaces where the county rebate or the lot's drainage calls for them.
Irrigation built to the rules
Every system we install is drip for beds and trees, with spray or rotary heads only on lawn. The mainline carries a filter and a pressure regulator, and a pressure regulating valve is added at the meter when static pressure exceeds 90 psi, which the city requires. Zones are separated by plant water need and sun exposure. The controller is a smart, weather adjusting model programmed for the St George summer window of 8 pm to 10 am and set for cycle and soak so water soaks into sandy or caliche soil rather than running off.
On rebate projects we install to the water district's drip and plant cover requirements and document the system the way the district's inspector expects to see it.

Planting in the right season
Fall through early spring is planting season on the Mojave edge. A one gallon plant set in October has six months of cool weather to root before the first 100 degree day, and it will outgrow a five gallon plant set in June within two years. We schedule planting accordingly whenever a project allows, and when a summer install cannot wait we plant early in the morning, water deeply, and set an establishment schedule that runs heavier for the first season.
Trees are staked, watered on their own drip zone, and mulched away from the trunk. Boulders are set a third buried so they look like they belong to the ground. Rock mulch is chosen for the wind exposure of the lot so it stays where it was raked.
Walkthrough and the first year
Every install ends with a walkthrough. We show you each valve and zone, explain the controller, hand over the plant schedule, and set the watering program for the season. Then we tell you what to expect: the first summer is the hard one, the second summer the yard fills in, and by the third it looks like the rendering. Installations are the build side of the landscape design work described on that page, and the way every whole yard project we take on gets built.